The Construction of the Coke Crushing Station and the conveyors

The Construction of the Coke Crushing Station and the conveyors

The Lukoil Energy Gaz power station comprises a 32MW turbine fuel by a 260 t/h 5400 C boiler. This boiler works on gas or breeze coke.

Industrial Montaj was actively involved in building these coke crushing stations and coke transportation conveyors. For this project we executed:

  • the fabrication and mounting for a crushing station building of a 120 tons metallic construction + cladding + part of the electricity main - low voltage
  • the fabrication and mounting of the fire fighting system, including the pumping station
  • the erection of coke crushing equipment and anti-dust treatment inside the coke crushing station
  • the prefabrication and mounting of a metallic structure for two 150 tons conveyor belts from 0 to 40 metres high + mechanical assembling of the conveyor belts under the supervision of FAM specialists (Forderanlagen Magdeburg - Germany)
  • The fabrication and mounting of the wagon unloading dock (90 t metallic construction), including the 2 conveyor belts and a coke bunker.