Increasing the recovery of the C3 fraction of poor gas from FCC

Increasing the recovery of the C3 fraction of poor gas from FCC

Increasing the recovery of the C3 fraction of poor gas from FCC

The project involves:

  •  Replacing top condensers for the main fractionation column at CC and Cx facilities;
  •  Erection of two coolers – alimentation of the primary absorber column -  GASCON section;
  •  Modernization of GASCON plant section CC

Industrial Montaj performed the following works:

  • Dismantling work was performed while the plant was in use
  • Carbon steel metal construction
  • Foundations vessels and supporting structure, sewage;
  • Assembling machinery and equipment; we used cranes from 50 to 250 to
  • Pipelines: piping isometric schemes, insulation, testing and certifications;
  • Electrical: Installation cable electrical heating, connections, testing
  • AMC Installations: Mounting gauge glass, pressure gauges, sensors, achieving isometric in field.

The work was very complex, and the term for the installation, pipping was limited to the period of the facilities shutdown for 45 days to capital maintenance.

 