Construction of the Process for a Detergent Factory

Contract Type: General Contractor

Sector: Cosmetics

Client: Procter & Gamble

Location: Romania

Period: 2020-2023

Procter & Gamble selected Industrial Montaj as the main partner for the construction and installation of the entire manufacturing process, including:

  • Unloading and erection of equipments
  • Tank Farm
  • Making Area
  • Packaging Area (3 lines)

All of Industrial Montaj's expertise was implemented, including:

  • Prefabrication and erection of piperack modules equipped with insulated piping (400 meters of pipe rack)
  • Lifting and erection of 17 tanks.
  • Lifting and erection of more than 45 process skids.
  • Unloading and mechanical installation of 45 equipment components for the packaging lines.
  • Prefabrication and erection of steel structures: 295 tons.
  • Prefabrication and erection of piping: 28,000 inches + 900 threaded fittings.
  • Electrical and instrumentation works (E&I): 70,000 meters.
  • Electrical tracing: 6,500 meters.
  • Nondestructive testing.
  • Test Pack & Passivation by recirculation.
  • Commissioning & Start-Up assistance.

Additional Information:

  • Orbital welding.
  • Electrical tracing.
  • Development of lifting plans and erection procedures.
  • GMP rules.