Contract Type: General Contractor
Sector: Cosmetics
Client: Procter & Gamble
Location: Romania
Period: 2020-2023
Procter & Gamble selected Industrial Montaj as the main partner for the construction and installation of the entire manufacturing process, including:
- Unloading and erection of equipments
- Tank Farm
- Making Area
- Packaging Area (3 lines)
All of Industrial Montaj's expertise was implemented, including:
- Prefabrication and erection of piperack modules equipped with insulated piping (400 meters of pipe rack)
- Lifting and erection of 17 tanks.
- Lifting and erection of more than 45 process skids.
- Unloading and mechanical installation of 45 equipment components for the packaging lines.
- Prefabrication and erection of steel structures: 295 tons.
- Prefabrication and erection of piping: 28,000 inches + 900 threaded fittings.
- Electrical and instrumentation works (E&I): 70,000 meters.
- Electrical tracing: 6,500 meters.
- Nondestructive testing.
- Test Pack & Passivation by recirculation.
- Commissioning & Start-Up assistance.
Additional Information:
- Orbital welding.
- Electrical tracing.
- Development of lifting plans and erection procedures.
- GMP rules.