Modernization of regenerator 138-FV3

Contract Type: General Mechanical Contractor (EGM)

Sector: Oil & Gas

Client: KMG - Rompetrol

Location: Romania – Petromidia

Period: 2020

During the 2020 Turnaround carried out by Industrial Montaj on the FCC – HPP – MHC – HDV units, we performed the replacement of the regenerator dome & cyclones of the FCC.

The Industrial Montaj teams were responsible for:

  • Developing the Detailed Design for the lifting and replacement operations of the Dome, Cyclones, and Air Distributor.
  • Transporting the dome from the storage area to the assembly area.
  • Dismantling the old dome, cyclones, and air distributor.
  • Lifting and installing the new components (150 tons).
  • Executing refractory works.

Additional information:

  • A 600-ton LR1600/2 crane was used for this operation.
  • The work was carried out under the supervision of Honeywell - UOP.