Turnaround 2020 Rompetrol Romania

 

Activity Type: General Mechanical Contractor

Sector: Oil & Gas, Petrochemicals

Client: KMG - Rompetrol

Country: Romania - Petromidia

Period: 2020

During the pandemic, Industrial Montaj accept the challenge to perform the 2020 General Shutdown (45 days) for the following units:

  • Fluid Catalytic Cracking (FCC)
  • Hydrogen Power Plant (HPP)
  • Mild Hydrocracking (MHC)
  • Middle Distillate Hydrotreating (HDV)

As a General Mechanical Contractor, our teams carried out:

  • Technical assistance for start up of the units
  • Dismantling / reassembly of 350 valves, safety valves
  • Execution of 122 pipeline repair projects
  • Metallurgical repairs of equipment
  • Post-weld heat treatment (PWHT)
  • Replacement of the cap, cyclones, stages 1 and 2, and replacement of the refractory protection in the regenerator
  • Pressure testing for 920 pipelines, registered at ISCIR
  • Pressure testing for equipment
  • Technical assistance for the restart of the installations

Material quality: 16Mo3, Gr. P11, P22, P5, 304L, 304H, 310, 316L, 321, 347, 410, Alloy 800H

Some equipment figures:

  • Columns: 19 units
  • Heat exchangers: 125 units
  • Reactors: 23 units
  • Tanks: 82 units
  • Furnaces: 5 units
  • Aerators: 89 units

A true human adventure, full of twists and daily challenges related to the pandemic restrictions!!